08-29-2016, 08:22 PM
Now comes the preparation of the crossover networks for rewiring and reinstallation in the cabinets.
I unsoldered the clipped wires from all of the terminals on both crossovers tonight.
My next move is to fit one in each cabinet, one at a time, and measure for new wires. Then I will cut and solder new wires to the crossovers, then install the crossovers in the cabinets.
Then the cabinets get moved upstairs, the speakers reinstalled and wired up, the new wires attached to the screw terminals on the backs...
Why don't I reinstall everything in the basement? Those cabinets are heavy with the speakers installed!
I unsoldered the clipped wires from all of the terminals on both crossovers tonight.
My next move is to fit one in each cabinet, one at a time, and measure for new wires. Then I will cut and solder new wires to the crossovers, then install the crossovers in the cabinets.
Then the cabinets get moved upstairs, the speakers reinstalled and wired up, the new wires attached to the screw terminals on the backs...
Why don't I reinstall everything in the basement? Those cabinets are heavy with the speakers installed!
--
Ron Ramirez
Ferdinand IN