07-02-2023, 01:30 PM
Setting up the moulding head.
The knives are installed in the head and carefully indexed. The back side of knife blanks are corrugated as is the head so once the set screws in the gibs are tightened there is no chance a knife could be thrown from the head.
The rub collar goes on the spindle under the moulding head.
The head has been installed on the shaper, We are now ready to make the chips fly!
To Be Continued
The knives are installed in the head and carefully indexed. The back side of knife blanks are corrugated as is the head so once the set screws in the gibs are tightened there is no chance a knife could be thrown from the head.
The rub collar goes on the spindle under the moulding head.
The head has been installed on the shaper, We are now ready to make the chips fly!
To Be Continued
M R Radios C M Tubes