11-01-2023, 09:58 AM
I just finished the double 8mfd can. The original solder lugs on the end of the can were riveted with aluminum rivets. I had to drill those out using a drill press. It was a bit fussy, but doable. I then added screws and solder lugs and finally soldered in the new caps.
Everything checked out good, so back into the chassis it goes....
Everything checked out good, so back into the chassis it goes....