02-14-2014, 12:51 AM
I must be missing something. When I read the AM Alignment Procedure it tells me to hook up the output meter to terminal 3 of the aerial terminal board and it says to hook up your signal generator according to the chart. On the chart it says to hook up the signal generator through a .1 mf cap to terminal 3 of TB400 , isn't that the aerial terminal board? I'm sure both the vtvm and the signal generator doesn't hook up to the same place. Hopefully someone can clear this up for me, thx.