Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5

To re-wire or not to re-wire....
#3

"Hot chassis" or, I'd rather call them AC/DC radios, typically AA5 or sometimes 4 or 6-tube jobs, were made from 30-s all the way into 50-s and so used different wires. I treat them on the individual basis, and not as a group. If you see the wiring is crumbling, then rewire; if not - leave it be.

People who do not drink, do not smoke, do not eat red meat will one day feel really stupid lying there and dying from nothing.


Messages In This Thread
To re-wire or not to re-wire.... - by Greenhorn - 09-08-2017, 12:53 PM
RE: To re-wire or not to re-wire.... - by morzh - 09-08-2017, 01:18 PM
RE: To re-wire or not to re-wire.... - by morzh - 09-08-2017, 06:39 PM
RE: To re-wire or not to re-wire.... - by Arran - 09-10-2017, 08:38 PM



Users browsing this thread: 1 Guest(s)